Numerical Capacitor Bank Protection Relay – GKCBR

Next-Gen Protection for compensation of reactive power

GKCBR is a dedicated capacitor bank protection relay perfectly aligned for measurement, control, and protection of the capacitor banks, which are used for the compensation of reactive power in railway power distribution systems.

GK Power, an RDSO-approved leading manufacturer in India, offers a numerical feeder protection relay at the industry’s latest technology. Enhanced safety by reducing hazards with safety-conscious testing of IEC 60255-1, IEC 60255-26, and IEC 60255-27, this relay unleashes its own full potential of working in hard environments with ingress protection of IP54.

Application

Capacitor bank protection of 25 kV and 2X25 kV systems for Indian Railways with respect to the below specification

  • TI/SPC/PSI/PROTCT/6072
  • TI/SPC/PSI/PROTCT/7101

Protection Function

  • Two-stage overcurrent protection
  • Two-stage overvoltage protection
  • Two stages under voltage protection
  • Two-stage unbalanced current protection
  • Two-stage unbalance voltage protection
  • Breaker Fail Protection
  • Trip circuit supervision
  • AP/GP low alarm
  • AP/GP low trip and lock
  • Interlock Timer


Product benefits

  • Our relays are available with selectable communication protocols such as IEC 61850 and IEC 60870-5-103 for SCADA communication through RS485 and RJ45 ports available on the rear side.
  • 50 cycles of actual waveform are stored in the built-in memory with date-time stamping for fault analysis.
  • Self-diagnostic feature for continuous monitoring of the internal hardware and alarm generation in case of failure of any critical components.
  • Ready to install at 25 kV Traction Transformer, 2×25 kV Scott connected and V connected Transformer & Feeder Panels at TSS

Product features

  • Drawout design
  • 20 x 4 LCD Alpha Numeric Display with Backlight Control and 10 Status Indication LEDs.
  • 5 Keys for Settings and Navigation, Individual Keys for Read/Record, LED Reset, and Hardware Reset